Concrete works of the swing bridge in the Old Harbour
Customer:
KMG Inseneriehituse AS
Location:
Tallinn august- oktoober 2020
Töö tüüp:
concrete works
Project manager:
Indrek Talvik
A pedestrian bridge with a reversible deck plate is to be built on the canal of the Admiralty basin, which will connect two harbour areas – terminals A and D. We carried out the construction of supporting structures and shore structures as well as the quay concrete structures.